Embroidery manufacturing
Embroidered Hoodie Manufacturing
Custom embroidered hoodies manufactured in Lahore for streetwear, corporate and promotional brands that want a premium, durable logo that survives years of washing.

Fabrics
Fabric options for embroidered hoodies
- 300β500 gsm brushed fleece
- French terry
- Cotton/poly blend
- Organic and recycled options
Customization
What you can specify
- Flat embroidery for clean logos
- 3D puff for raised statement marks
- Chenille for varsity character
- AppliquΓ© for oversized motifs
- Chest, sleeve, hood, jacket back
Branding
Private-label finishing
- Left-chest logo
- Full-back statement
- Sleeve and hood marks
- Matching pant branding
- Corporate uniform programmes
MOQ
Minimum order quantity
Entry minimum is 30 pieces per style and colour across the range.
Sampling starts with a small first run. Bulk and repeat orders follow the approved sealed reference.
Who it is for
Buyers we produce for
- Streetwear labels with a premium stitched chest piece
- Brands combining puff or chenille with a fleece body
- Retailers needing an embroidered hoodie rather than a printed one
Quality control
How quality is controlled
- Digitised for the exact fabric and sewn out for approval before bulk
- Tension logged per shift on multi-head machines
- Fabric weight and shade verified against the approved sample
- Final AQL 2.5 inspection to ANSI/ASQ Z1.4
Process
From design to finished product
- 01
Artwork review
Placement and stitch type confirmed.
- 02
Digitise
Push-and-pull compensation set.
- 03
Sew-out
Approved before bulk.
- 04
Bulk embroidery
Multi-head, 15-colour.
- 05
Inspect & pack
AQL final.
- 06
Ship
Worldwide freight.
FAQ
Embroidered Hoodies β common questions
What is the best embroidery for hoodies?+
Flat embroidery for clean logos, 3D puff for raised statement marks.
Can you embroider on 500 GSM fleece?+
Yes β our multi-head machines handle heavyweight fleece without issue.
What is the MOQ?+
Entry minimum is 30 pieces per style and colour across the range.
What is the lead time?+
Around 4β5 weeks from approved sew-out to ex-works.
Explore more